OEM & ODM apparel manufacturing since 2004 · Shenzhen, China

Tech Pack Template: The 14 Pages a Factory Needs

A 14-page tech pack checklist for apparel factories, with the fields each page should carry, common omissions, and how to request a review of your pack.

Tech Pack Template: The 14 Pages a Factory Needs

Answer first: A factory can cut, sew and pack from a 14-page tech pack if those pages actually carry the measurements, materials, artwork, packing and test rules for the style. The list below is that checklist: what each page is for, which fields belong on it, and which omissions cause a sample to come back wrong. This article does not offer a downloadable file. If you want a copy of a worked example, or a review of a pack you already have, contact us and we will do that on the order file. It complements our earlier guide to the minimum tech pack a factory needs for underwear, and widens the same idea to a full apparel pack.

A tech pack is not a mood board and not a spreadsheet of prices. It is the instruction set that a pattern maker, a merchandiser, a cutting table and a packing line will share. If a fact lives only in an email, it will not be on the sample.

The 14 pages, and the fields each one should carry

Use these pages as a checklist. You may combine two short pages onto one sheet, but do not drop the fields. Number the pack, date it, and give every revision a new number.

PagePurposeFields that should be on it
1. Cover and style summaryIdentify the styleStyle name and number, season, buyer, category, intended market, sample size, date, revision, a flat or photo of the approved direction
2. Front and back flatsShow the garment clearlyScaled front and back drawings, or clearly photographed fronts and backs, with grain and left/right obvious
3. Construction and stitch calloutsTell the sewing line how it is builtSeam types, stitch types, stitches per inch or centimetre, topstitch placement, bartacks, bonding or tape, thread colour
4. Measurement pointsDefine how to measureA point diagram that matches the names on the measurement chart; see our 12 knit-top measurement points
5. Size chart and grade ruleGive every size a numberSample-size measurements, increments or full chart, units, and inspection tolerances
6. Fabric bill of materialsLock the clothFibre, structure, GSM, width, finish, colour reference, mill or quality code, shrinkage and any certificate to be collected
7. Trim and label bill of materialsLock everything that is not the main clothElastic, thread, drawcords, zips, buttons, hooks, heat transfer, main label, size label, care label, hangtag, with supplier or quality codes and consumption per piece
8. ColourwaysShow every colour you will cutColour name, standard (lab dip, pantone or physical standard), which pieces take which colour, and whether top and bottom must match as a set
9. Print, embroidery or application placementsLocate decorationPlacement from a defined point, size, rotation, colour separations, stitch count or print process, and a photo or drawing on the garment
10. Artwork filesGive production the actual artFile names, colour mode, size at 100%, fonts converted to outlines, and which revision is current
11. Packing and labellingTell the packing line how it leavesFold, polybag or box, warning copy, tickets, barcode or GTIN rules, inner and outer carton, marks, assortment
12. Test requirementsState what must be testedTest methods, required results, who pays, which lab, and whether tests are on fabric, trims or the finished garment
13. Inspection and quality gatesState how the lot will be acceptedIncoming fabric check, in-line points, final AQL (Finetex publishes a final AQL 2.5), measurement audit, packing audit, shipment check against the approved sample
14. Approval and revision historyRecord what was agreedWho approved the proto, the fit, the size set, the lab dips and the packed sample, with dates; a list of open issues
Also check:  Shenzhen Clothing Manufacturer Ultimate Guide to Top Factories and Production

Page 11 is where retail vendor rules belong if you have them: ticket placement, carton marks, and the data a customer will need for an advance ship notice. Page 12 is where you prevent a late argument about pilling, colourfastness or fibre composition. If a certificate or a test is a condition of the claim you will print, write it here and collect the document, as we do for fibre claims on our quality control and sustainability pages.

Common omissions that send a sample back

These are the gaps we see when a pack looks complete and still is not sewable:

  • Flats without a measurement diagram, or a chart whose point names do not match the diagram.
  • A size chart with no tolerance and no unit, or a grade rule that stops at the sample size.
  • Fabric described only as “cotton jersey” with no GSM, width, finish or shrinkage.
  • Trims missing from the bill of materials — especially size labels, care labels, thread colour and packing stickers.
  • Artwork at the wrong scale, or a placement that is not measured from a defined point (collar seam, hem, centre front).
  • No packed-sample instruction, so the factory sews a correct garment and bags it in a way the retailer will reject.
  • No revision history, so an old print file is used after a new one was “sent yesterday.”
  • A fibre or chemical claim with no document listed, which should not appear on a label.

A short example, kept generic: a knit top pack that includes flats, a chest measurement and a fabric name, but no neck-width point, no rib specification and no packed fold, will usually come back with a neck that was built from habit and a fold that does not match the photograph. Adding pages 4, 7 and 11 would have prevented the second sample.

How to use the checklist, and how to ask for a review

Work through the 14 pages against your current file and mark anything that is missing or that lives only in a chat thread. Put the missing fields into the pack, raise the revision number, and send that version with the sample request. If you do not have a design team, start from the underwear minimum-pack article and add the pages you need for the actual category (a lounge set, for example, needs set colour rules and a packed-set page).

Also check:  First-Output Check: The In-Line Inspection That Saves Bulk

We will review a pack as part of sampling, not as a public download. Contact us with the style, the category and the file you have. We will say which fields are missing, which we can complete with you, and which approvals (lab dip, size set, packed sample) should happen before bulk. Development samples take 5–7 working days after artwork and fabric are confirmed; a size set takes 10–12 working days. Our apparel design page is the right starting point for that work.

What happens to the pack inside the factory

Once the 14 pages are complete, different people use different sheets. Pattern uses pages 2 to 5. Purchasing uses pages 6 to 8 to reserve fabric and trims. The print or embroidery desk uses pages 9 and 10. The packing line uses page 11. Quality uses pages 12 and 13 against the approved sample recorded on page 14. If one of those groups is working from a different revision, the sample will be a mix of two instructions. That is why the cover date and the revision history are not administrative extras. Send one dated PDF or one dated folder, and say which revision supersedes the last.

What is fact, what is advice and what is uncertain

Fact: Finetex sampling lead times, final AQL 2.5 and the published inspection gates are company facts. There is no downloadable template file published on the live site, so none is linked here.

Advice: the 14-page list and the omissions are our practical checklist. Combining short pages is fine; dropping fields is not.

Uncertain: retailer manuals, test methods and certificate rules change. Always add the current account and market requirements to pages 11 and 12 rather than assuming this checklist already contains them.

Related reading

Frequently asked questions

Is there a downloadable tech pack file on this page?

No. The 14-page checklist is the template. If you need a worked example or a review of your pack, contact us and we will do that on the order file.

Do I need all 14 pages for a simple T-shirt?

You need all of the fields. A simple T-shirt may fit some fields onto fewer sheets, but skipping measurement points, trims, packing or a revision history is how a simple T-shirt still comes back wrong.

How is this different from the underwear minimum tech pack?

The underwear article is the minimum needed to sew a brief or boxer brief. This checklist is the same idea written as 14 pages, including packing, tests, inspection and a revision history, for knit tops and other cut-and-sew styles as well.

Also check:  What is the history of plaid fabric: A Production-Side Explanation

When should the packed sample be approved?

Before bulk, as part of the pre-production approval, using the fold, bag or box on page 11. A hangered fit sample does not prove packing.

What if my artwork is still changing?

Keep sampling, but do not release bulk until page 10 carries a dated, named file and page 14 records the approval. An undated “final” file is how the wrong print is cut.

Sources

Request a review of your tech pack

Send us the style, the category and the pack you have, even if some pages are incomplete. We will tell you which fields are missing and how we would sample from a completed revision.

Contact us or start on our apparel design page.

Keep reading

More factory-floor notes for brand owners

Request a sample & pricing information

Send us your tech pack, target price or a reference sample — we reply with a quotation, a realistic lead time and a fabric recommendation within one working day.

  • Free sampling plan & cost breakdown
  • MOQ from 300 pcs per style
  • Reply within 1 working day
Scroll to Top