Apparel Cost Breakdown: Fabric, CMT, Trims, Packing and Overhead
Break any garment price into fabric, CMT, trims, packing and overhead with a reusable costing template and a clearly labelled illustrative example.

Answer first: A garment’s factory price (FOB) is built from five blocks: fabric, CMT (cut, make and trim labour), trims and labels, packing, and factory overhead plus margin. To read a quote, ask for each block as a line, calculate it per piece from a consumption figure or a rate you can check, and compare quotes block by block rather than by the total. This article gives a blank template and a worked example. All numbers in the example are illustrative and are not Finetex prices or market data.
Most first-time brands receive a single number per piece and have no way to judge it. A quote that looks cheap may be cheap because of a thinner fabric, a lighter trim, or a packing method that does not match the retail plan. A quote that looks high may include things the cheaper one leaves out. The only reliable way to compare is to break both quotes into the same blocks. This guide explains each block, what moves it, and which questions to ask. It is a method guide: it does not publish Finetex prices, because a real price depends on the specification, the quantity and the fabric on the day of quotation.
For the step after FOB, which covers freight, duty and fees, see our guides on building a landed cost sheet and the six-input landed cost method. If you only need the underwear-specific view, our earlier article on the underwear quote cost breakdown is more specific to that category.
The five blocks of an apparel price
Every cut-and-sew garment price can be split into the same five blocks. Factories use different words, but the content is consistent.
| Block | What it covers | Main driver | Question to ask |
|---|---|---|---|
| 1. Fabric | Knit or woven cloth, dyeing, finishing, wastage in cutting | Fabric type, weight, width, colour, consumption per piece | What consumption per piece did you assume, and at what fabric width? |
| 2. CMT | Cutting, sewing, pressing, in-line handling | Style complexity, number of operations, order size | Is this a per-piece labour rate, and which operations does it include? |
| 3. Trims and labels | Waistband elastic, thread, labels, drawcords, zips, buttons, hangtags | Specification, branding, supplier minimums | Which trims are standard, and which are custom-made for me? |
| 4. Packing | Polybag, sticker, multipack, inner and outer carton | Retail vs wholesale packing, carton count | What is included in the unit price and what is charged separately? |
| 5. Overhead and margin | Factory management, utilities, QC, sampling cost spread, profit | Order size, factory utilisation, payment terms | Is sampling cost separate, and is it credited against the order? |
The blocks are not equal in how much control you have over them. Fabric and trims respond directly to your specification. CMT responds to design choices. Packing responds to your retail plan. Overhead and margin respond mostly to order size and to how complete your information is.
Block 1: Fabric
Fabric is usually the largest block for a knitted basic such as a T-shirt or boxer brief, and it is the block most affected by specification. Three variables set it:
- Cloth price per kilogram or per metre. This depends on fibre (cotton, modal, polyester, blends), yarn, structure, weight in grams per square metre (GSM) and the dyeing or finishing process.
- Consumption per piece. This is the amount of fabric one garment needs, including the pattern pieces and the unavoidable gaps between them on the cutting table. It is measured in kilograms or metres per piece and depends on size, pattern and fabric width.
- Wastage. Cutting never uses 100% of the cloth. Allowances cover end-of-roll waste, defects and spare panels for replacement.
The formula is simple:
Fabric cost per piece = consumption per piece × cloth price per unit, plus a wastage allowance.
Ask the factory to state consumption per piece and the cloth price basis. If the quote says “fabric” without a consumption figure, you cannot test it. If you change the fabric weight, the consumption in kilograms changes too, because a heavier fabric of the same dimensions weighs more. A change from a light to a heavy jersey therefore raises the fabric block twice: once through the price per unit and once through the weight per piece.
Fabric also carries the dyeing decision. A custom colour usually means a dye minimum at the mill, which can raise the cost of a small order; see our article on volume tiering and price breaks for how colour and fabric minimums interact with quantity.
Block 2: CMT (cut, make, trim)
CMT is the labour and process cost of turning cloth into a garment. In the trade, “trim” here means finishing operations such as thread trimming, not trims in the sense of accessories. It includes:
- Spreading and cutting the fabric.
- Sewing, which depends on the number of operations in the style.
- Pressing, folding and in-line handling.
A plain T-shirt has fewer operations than a lined, paneled or heavily detailed garment, so its CMT block is smaller. The number of operations, rather than the garment category name, is what to compare. If two quotes for similar garments differ sharply in CMT, ask what each includes: pocket, double-needle hems, bar tacks, taped seams and bonded finishes each add operations.
CMT also depends on how long a style stays on a line. Short runs spend a larger share of time on line changeover, so the same style can carry a higher CMT per piece at a smaller quantity. That is a labour-efficiency effect, and it is part of why prices fall with volume.
Block 3: Trims and labels
Trims are everything on the garment that is not the main fabric. For underwear this means waistband elastic, thread and labels. For a hoodie it means drawcord, eyelets, rib and zip. For a T-shirt it is mostly neck tape, labels and thread.
Two points matter when reading this block:
- Standard versus custom. Stock trims are cheaper and faster. Custom woven labels, custom-printed waistbands or branded zip pullers have their own minimum quantities and lead times, which can set the schedule.
- Required labels are part of the garment, not an extra. For the US, the content you must put on labels (fibre content, origin and manufacturer identity or RN, and care instructions) is set out in the FTC’s textile rules, so budget for a label that carries all of it. Your destination market may require more.
Ask for a trim list with a specification and quantity per piece. Your tech pack should list every trim; an incomplete tech pack produces either an incomplete quote or a substitution at sampling.
Block 4: Packing
Packing is cheap per piece but easy to forget. The line should state the unit pack (polybag, hanger, boxed, multipack), the inner packing (sticker, barcode, insert card) and the outer carton (pieces per carton, carton size, marking). Packing also affects freight, because carton size sets cubic volume. A packing method that saves a few cents in the factory but adds cartons can cost more in shipping. See our private packaging page for the options Finetex handles and our shipping solution page for the delivery terms.
Block 5: Overhead and margin
This block covers the part of the price that is not a direct input: management, utilities, quality control, sampling effort that is spread across orders, and the factory’s profit. You will not see it itemised in most quotes, and you should not expect a factory to break out its profit. What you can ask is narrower and more useful: which services are included (inspection, measurement report, packing audit), whether the sample cost is charged separately or credited against the bulk order, and what payment terms the price assumes.
For Finetex, bulk orders are generally handled by bank transfer with a 30% deposit and the 70% balance before shipment, and the terms are confirmed in the quotation or proforma invoice. The quality gates we use are described on our quality control page.
A worked example, using illustrative numbers
The example below shows how to fill the template. Every number is an illustrative example chosen for arithmetic clarity. They are not Finetex prices, not market data and not a benchmark for any real product. Replace them with figures from your own quotation.
Assume a quote for 500 pieces of a knitted boxer brief, FOB. The factory quotes five lines per piece, in an arbitrary unit of currency:
| Block | Illustrative amount per piece | Share of illustrative total |
|---|---|---|
| Fabric | 1.60 | 40% |
| CMT | 1.00 | 25% |
| Trims and labels | 0.60 | 15% |
| Packing | 0.20 | 5% |
| Overhead and margin | 0.60 | 15% |
| Total FOB per piece | 4.00 | 100% |
How to use it:
- Rebuild the total. The five lines add up to 4.00. Multiply by 500 pieces and the order value is 2,000 in the same unit.
- Compute shares. Divide each block by the total. In this example, fabric is 1.60 ÷ 4.00 = 40%.
- Test one block. If the factory says consumption is 0.16 kg per piece and the cloth is 10.00 per kg, fabric is 0.16 × 10.00 = 1.60. The check works only because the inputs are stated; if they are not, ask for them.
- Run a what-if. If the fabric block rose by 10%, from 1.60 to 1.76, the total would move from 4.00 to 4.16, which is a 4% change in the total, not 10%. The share of a block tells you how much a change in that block affects the price.
The shares above are not typical for the industry. A different style, fabric or quantity will give different shares. The value of the exercise is the method.
The blank template
Copy this table into a spreadsheet and ask each supplier to fill it, or fill it from their quote:
| Line | Input needed | Formula | Value |
|---|---|---|---|
| A | Consumption per piece | from supplier | |
| B | Cloth price per unit | from supplier | |
| C | Wastage allowance | stated % or amount | |
| D | Fabric per piece | A × B, plus C | |
| E | CMT per piece | from supplier | |
| F | Trims and labels per piece | from list | |
| G | Packing per piece | from spec | |
| H | Overhead and margin per piece | from supplier or remainder | |
| I | FOB per piece | D + E + F + G + H | |
| J | Order quantity | from you | |
| K | Order value | I × J |
If a supplier gives only a total, line H is the remainder after you have estimated D to G. Mark it as a remainder, because the estimate is yours.
Variables that change the answer
The five blocks react differently to these changes:
- Fabric weight or fibre. Moves the fabric block, and slightly the CMT block if the cloth is harder to sew.
- Colour count. Moves fabric through dye minimums and the schedule through colour-by-colour cutting.
- Number of styles. Moves overhead and CMT, because each style needs its own pattern, sample and line setup.
- Order quantity. Moves CMT and overhead most, and fabric when it crosses a mill minimum.
- Branding and packing. Moves trims and packing, and freight through carton volume.
- Quality level. Inspection depth and testing add cost in overhead, and reduce the cost of returns after shipment.
Finetex minimum order quantities start at 300 to 1,000 pieces, depending on the product and customisation, and are confirmed in the quote. A sample takes 5 to 7 working days after artwork and fabric are confirmed, and bulk production takes 15 to 45 days from deposit and approved pre-production sample.
What the factory price does not include
FOB covers the factory’s price and delivery to the port of loading. It does not include ocean or air freight, insurance, import duty, customs fees, inland delivery or your own costs for samples, testing and design. In US customs practice the customs value of an imported good is generally the transaction value, the price actually paid or payable. International freight and insurance are not part of that value when they are separately identified, which is why FOB and CIF prices are not directly comparable. Duty is therefore calculated on a number that differs from your landed cost. Use a licensed customs broker for the real calculation.
Fact, advice and uncertainty
Fact (checked on 12 November 2026): the US customs value definition in 19 CFR 152.103, which describes transaction value as the price actually paid or payable and excludes separately identified international freight and insurance; the label content requirement in 16 CFR 303.16; and the Finetex information on sampling, lead time, minimum quantities, payment terms and quality gates taken from our published pages.
Advice: the five-block method, the template and the questions to ask. These are recommendations, not rules.
Uncertainty: the illustrative figures are not real prices. Real costs change with fabric markets, labour and freight. Ask for a written quotation for your specification, and ask a licensed customs broker about duty and fees for your destination.
Related reading
- Volume Tiering: How Price Breaks Work at 500, 3,000 and 10,000 Pieces
- Building a Landed Cost Sheet: FOB, Freight, Duty, Fees
- Landed Cost Calculator: FOB to Door in Six Inputs
- China vs Bangladesh: When the Lowest FOB Is the Wrong Number
Frequently asked questions
What is CMT in garment manufacturing?
CMT stands for cut, make and trim. It is the labour and process cost of cutting the fabric, sewing the garment and finishing it, excluding the fabric and the accessory trims. Some quotes are CMT-only, where you supply the fabric, and others are FOB, where the factory supplies everything and delivers to the port.
What share of a garment’s price is fabric?
It depends on the product, the fabric and the quantity, and there is no single figure that holds across factories. For basic knitwear fabric is often the largest block, but a complex style can push the CMT share above it. Use the template to calculate the share from your own quote instead of relying on a general percentage.
Why do two quotes for the same garment differ?
Usually because of different assumptions: fabric weight or quality, consumption per piece, trim specification, packing method, or what is included in inspection and sampling. Put both quotes into the same five-block table and compare line by line.
Does the sample cost belong in the unit price?
Not normally. Sample cost is usually separate. For Finetex, sample cost is credited against the bulk order, as stated on our product pages. Confirm the credit terms in your quotation.
Is FOB the final cost of my order?
No. FOB excludes freight, insurance, duty, customs fees and delivery to your warehouse. Add those on a landed cost sheet.
Sources
- eCFR: 19 CFR 152.103, Transaction value (US customs valuation)
- eCFR: 16 CFR Part 303, Textile Fiber Products Identification Act rules (label content)
- US Customs and Border Protection: Customs brokers
Get a quote broken into the five blocks
Send your tech pack, target quantity and fabric reference, and tell us you want the quotation split by fabric, CMT, trims, packing and inclusions. We will review the specification and reply with a quotation, estimated lead time and sampling details.
Request a quote, see our private label service or read the clothing factory sourcing guide.
More factory-floor notes for brand owners

Selling Underwear in Germany: Textilkennzeichnung, LUCID and Packaging Law
German textile labelling, LUCID registration and packaging law for underwear brands after the PPWR and VerpackDG took effect…
Read more →
GSM to Ounce Converter and Fabric Weight Chart
Convert fabric weight between gsm and oz/yd² with the exact factor (1 oz/yd² = 33.906 g/m²), a T-shirt…
Read more →
First-Output Check: The In-Line Inspection That Saves Bulk
What to check on the first garments off each line: measurements, seams, labels and print against the approved…
Read more →
A Fit Session Protocol for Knit Tops: 12 Wearers, 5 Measurements
A recommended fit session protocol for knit tops: recruit 12 wearers, take five measurements, run a movement checklist,…
Read more →
Corporate Uniform Programs: Tendering, Sizing and Reorders
How to run a corporate uniform program with a factory: tender documents, sizing a workforce, producing many sizes…
Read more →
Muscle Fit and Athletic Fit T-Shirts: Pattern Changes That Matter
How muscle fit and athletic fit T-shirts differ from a classic block: chest-to-waist drop, sleeve cap and bicep,…
Read more →Request a sample & pricing information
Send us your tech pack, target price or a reference sample — we reply with a quotation, a realistic lead time and a fabric recommendation within one working day.
- Free sampling plan & cost breakdown
- MOQ from 300 pcs per style